RIKEN Nishina Center for Accelerator-Based ScienceAccelerator Group
Group Director: Osamu Kamigaito (D.Sc.)
Research Summary

The accelerator group is pursuing various upgrade programs of the world-leading heavy-ion accelerator facility, RI-Beam Factory (RIBF), to enhance the accelerator performance and operation efficiency. We are also promoting developments of the RIBF for applications to a variety of research fields.
Main Research Fields
- Engineering
Related Research Fields
- Mathematical & Physical Sciences
Keywords
- High-intensity heavy-ion beam
- Cyclotron
- Ion source
- Superconducting rf cavities
- Accelerator science
Selected Publications
- 1.
T. Nishi, T. Watanabe, T. Adachi, R. Koyama, K. Yamada, N. Sakamoto, O. Kamigaito:
"Nondestructive beam envelope measurements using beam position monitors for low-beta heavy ion beams in a superconducting linear accelerator"
Phys. Rev. Accel. Beams 28, 092803 (2025). - 2.
O. Kamigaito:
"High-beam-power operations at heavy-ion facilities: technical developments, challenges, and resolutions"
Proceedings of the 16th International Particle Accelerator Conference (IPAC2025), Taipei, Taiwan, MOXP2, (2025). - 3.
H. Imao:
"Status update of the Charge Stripper Rings project"
JINST 18 P03028 (2023). - 4.
H. Imao:
"Charge Stripper Ring for RIKEN RI Beam Factory"
JINST 15 P12036 (2020). - 5.
O. Kamigaito, K. Ozeki, N. Sakamoto, K. Suda, K. Yamada:
"Measurement of mechanical vibration of SRILAC cavities"
Proceedings of the 19th International Conference on RF Superconductivity (SRF2019), Dresden, Germany, TUP042, p. 515 (2019). - 6.
H. Okuno, N. Fukunishi, O. Kamigaito:
"Progress of RIBF accelerators"
Progress of Theoretical and Experimental Physics, 03C002. (2012). - 7.
M. Kase, M. Fujimaki, Y. Higurashi, E. Ikezawa, O. Kamigaito, M. Komiyama, T. Nakagawa, K. Ozeki, N. Sakamoto, K. Suda:
"Heavy-ion beam acceleration at RIKEN for the super-heavy element search"
Proceedings of the 3rd International Particle Accelerator Conference (IPAC2012), New Orleans, USA, THPPP040, p. 3823 (2012). - 8.
A. Goto:
"Review of high power cyclotrons for heavy ion beams"
Proceedings of the 19th International Conference on Cyclotrons and their Applications (CYC2010), Lanzhou, China, MOM2CIO01, p. 9 (2010). - 9.
Y. Yano:
"The RIKEN RI Beam Factory Project: A status report"
Nucl. Instrum. Methods B 261, 1009 (2007). - 10.
O. Kamigaito:
"Circuit-model representation of external-Q calculation"
Phys. Rev. ST Accel. Beams 9, 062003 (2006).
Events
Related Links
Lab Members
Principal investigator
- Osamu Kamigaito
- Group Director
Core members
- Nobuhisa Fukunishi
- Deputy Group Director
- Hiroki Okuno
- Deputy Group Director
- Takahide Nakagawa
- Senior Visiting Scientist
Careers
Contact Information
204 Nishina LINAC Laboratory,
2-1 Hirosawa,
Wako, Saitama
351-0198, Japan
Email: kamigait@riken.jp
Organization
- Accelerator R&D Team
- Hiroki Okuno (D.Sc.)
- Ion Source Team
- Osamu Kamigaito (D.Sc.)
- RILAC Team
- Yoshihide Higurashi (D.Sc.)
- Cyclotron Team
- Naruhiko Sakamoto (D.Sc.)
- Beam Dynamics and Diagnostics Team
- Nobuhisa Fukunishi (D.Sc.)
- Cryogenic Technology Team
- Hiroki Okuno (D.Sc.)
- Infrastructure Management Team
- Masanori Kidera (D.Sc.)